The brakeman sets the engine coupler to connect up a short train. This begins the run back to the exchange with the Union Pacific. The GP16 will push the train 5 miles back to the mainline. The pl... (more)
Still working part time on the San Pedro Railroad.
I've heard that San Pedro may be back in business again. Looks like they are preparing this one for action.
SWKR GP20 2044 & sister are sitting at Benson, Az. awaiting their next assignment